Located 180 km southeast of Ross River, the Wolverine property is 100 per cent wholly owned and operated by Yukon Zinc Corporation. The Wolverine Project is proposed as an underground mine which will produce 1,700 tonnes per day. Measured and Indicated resources are approximately 4.46 million tonnes grading 12.14 per cent zinc, 354.8 grams per tonne silver, 1.16 per cent copper, 1.69 grams per tonne gold and 1.58 per cent lead.
Yukon Zinc Corporation was acquired by two private Chinese companies: the Jinduicheng Molybdenum Group and the Northwest Nonferrous International Investment Company in the summer of 2008.
The Quartz Mining License and Type “A” Water License have been issued which involved comprehensive consultation with the Kaska. The water license allows development of tailings structures and other water related infrastructure.
Development activities are proceeding on site and production is scheduled for 2011.
*The Type “A” Water License for this project is available online.
Licenses, Authorization or Approvals
Approval of Revision to Monitoring and Surveillance Plan Version 2011-03 Section 8.3
63.3 KB
Approval of Addendum to Tailings and Infrastructure Design and Construction Plan, Version 2009-02-Stage 2 Dam
57.3KB
Approval of Monitoring & Surveillance Plan Version 2011-03
49KB
Approval of Addendum to General Site Plan Version 2011-05 for Operations Phase Waste Rock
681KB
Approval of Wolverine Project General Site Plan, Version 2011-05
1.17 MB
Approval of Addendum to General Site Plan V2008-04 for Underground Mine Roadbed Material
604 KB
Approval of Addendum to General Site Plan V2008-04 for Borrow Material
630 KB
982KB
1 MB
1 MB
700 KB
3.7 MB
4.3 MB
868 KB
956 KB
394 KB
752 KB
486 KB
426 KB
1.3 MB
1 KB
580 KB
2 MB
625 KB
2011 Annual Report Quartz Mining License QML-0006
6.64 MB
12.7 MB
8.48 MB
2011 Wildlife Protection Plan Annual Monitoring Report
9.9MB
2011 Monitoring and Surveillance Annual Report
8.69MB
Wolverine Mine Tailings Facility Design Overview for Stage 2 Dam Construction
6.91 MB
Monitoring and Surveillance Plan Version 2011-03
14.2MB
Addendum to General Site Plan Version 2011-05 for Operations Phase Waste Rock Stockpile
37.4KB
2011 Annual Physical Inspections
8.75 MB
Addendum to General Site Plan Version 2008-04 for Borrow Material
1.43MB
12.9MB Part Two
26.6 MB
9.08MB
3.54MB
17.4 MB "Currently Under Review"
4.72MB
1.51MB
200 KB
540 KB
3 MB
1.5 MB
3 MB
5.5 MB
4.3 MB
28 MB
7.44 MB
6.08 MB
4.7 MB
1.8 MB
4.7 MB
1.8 MB
1.4 MB
28.7 MB
3.0 MB
33 MB
6.5 MB
2.2 MB
14.6 MB
6.6 MB
6.2 MB
1 MB
1 MB
92 KB
515 KB
19.4 MB
7 MB
34 MB
900 KB (Nov. 2007)